Uploaded image for project: 'Puppet'
  1. Puppet
  2. PUP-5776

Master Theme: Working with Themes and Epics in the Puppet Project

    XMLWordPrintable

Details

    • Story
    • Status: Closed
    • Normal
    • Resolution: Done
    • None
    • None
    • None
    • None
    • Coremunity

    Description

      As a user of Jira focusing on the PUP project, I want to know about existing Epics, and how they should be applied. When we make released I want to know what needs to be done to ensure we have the relevant Epics defined.

      I expect the PUP folks to update this story with links to the available Themes. And that this description is updated with an overall description of how Themes and Epics work.

      DESCRIPTION OF THEMES AND EPICS


      A Theme represents an activity that stretched over many releases; e.g. "Performance". We use an Epic to describe such themes. They are always named with a prefix of "Theme:". An example is PUP-5775 "Theme: Performance" Epic.

      For each release series, there is an Epic that contains the tickets that directly implements something in that theme. Other tickets may also support that Epic. As an example PUP-5773 "4.x Performance" is an Epic that supports "Theme: Performance".

      (This construct is used since Jira does not support the notion of Theme).

      RELESE SERIES EPICS


      Release series epics are named Nx <name_of_theme> e.g. "4.x Performance". Such themes are created lazily when there is going to be work on that theme for a release series.

      RELEASE EPICS


      If there is a need to create an Epic that is closed with a specific release, it should be given a concrete version name e.g. "4.4 Performance", and this ticket should support "4.x Performace". which in turn supports "Theme: Performance".
      The decision to use a release specific epic is based on how many tickets there are in total for the release, and for the release series. If there are too many tickets it becomes hard to find and navigate. Hence the option to use version specific epic.

      RULES


      • Always use the Epic name as the start of the Summay or risk not finding the ticket when linking with "supports"
      • Assign thematic themes to all scrum teams that the theme is relevant for
      • Never place a multi team Epic in a sprint (if you must keep track of work on the Epic itself - defining it etc. use separate tasks). A Jira project administrator will otherwise be pushed one level down in dante's inferno for every such breaking of this rule).

      Attachments

        Issue Links

          Activity

            People

              Unassigned Unassigned
              henrik.lindberg Henrik Lindberg
              Votes:
              0 Vote for this issue
              Watchers:
              2 Start watching this issue

              Dates

                Created:
                Updated:
                Resolved:

                Zendesk Support